"/>

一级做a免费观看大全视频,中文字幕乱码无限2019,日日麻批40分钟免费视频播放,精品专区性色av,国产性夜夜春夜夜爽,岛国三级片免费看久久,久久五月天和激情网

Vietnam to spend 5.5 bln USD building 3 urban rail routes in capital
Source: Xinhua   2018-04-10 13:49:14

HANOI, April 10 (Xinhua) -- Vietnam's Hanoi authorities have proposed that the government instruct the early construction of three urban rail routes with total investment of 125,614 billion Vietnamese dong (over 5.5 billion U.S. dollars), Vietnam News Agency reported on Tuesday.

The urban rail route No.2, which runs from Tran Hung Dao Street to Thuong Dinh Street, will go underground for nearly 6 km with a design speed of 80 km per hour, and be built from 2018 to 2024.

The urban rail route No.5, which stretches from Van Cao Street to Hoa Lac area, will have a total length of 38.4 km with the speed of 90-120 km per hour, and become operational in 2025.

The urban rail route No.3, which goes from Hanoi Railway Station to Hoang Mai district, will have a total length of 8.7 km, and be constructed in the 2018-2025 period.

According to Hanoi's plan on developing transport till 2030 and with vision to 2050, the capital city will build a total of 10 urban rail routes with combined length of 417.8 km, including 75.5 km going underground, with total investment of nearly 40.1 billion U.S. dollars.

Editor: ZX
Related News
Xinhuanet

Vietnam to spend 5.5 bln USD building 3 urban rail routes in capital

Source: Xinhua 2018-04-10 13:49:14
[Editor: huaxia]

HANOI, April 10 (Xinhua) -- Vietnam's Hanoi authorities have proposed that the government instruct the early construction of three urban rail routes with total investment of 125,614 billion Vietnamese dong (over 5.5 billion U.S. dollars), Vietnam News Agency reported on Tuesday.

The urban rail route No.2, which runs from Tran Hung Dao Street to Thuong Dinh Street, will go underground for nearly 6 km with a design speed of 80 km per hour, and be built from 2018 to 2024.

The urban rail route No.5, which stretches from Van Cao Street to Hoa Lac area, will have a total length of 38.4 km with the speed of 90-120 km per hour, and become operational in 2025.

The urban rail route No.3, which goes from Hanoi Railway Station to Hoang Mai district, will have a total length of 8.7 km, and be constructed in the 2018-2025 period.

According to Hanoi's plan on developing transport till 2030 and with vision to 2050, the capital city will build a total of 10 urban rail routes with combined length of 417.8 km, including 75.5 km going underground, with total investment of nearly 40.1 billion U.S. dollars.

[Editor: huaxia]
010020070750000000000000011100001371002181


一级做a免费观看大全视频,中文字幕乱码无限2019,日日麻批40分钟免费视频播放,精品专区性色av,国产性夜夜春夜夜爽,岛国三级片免费看久久,久久五月天和激情网 国产视频观看91 国产00在线视频国产 国产综合色视频久久久 久久成人国产精品一区二区 高清无码免费黄色网站